On site environmental testing
-
Electrical operating environment testing
-
Cleaning of dust inside the cabinet and filter (transformer cabinet/power cabinet/control cabinet)
-
Visual inspection and testing of key components
-
Backup and optimization of human-machine interface parameters
-
Insulation testing between components
Spot-check
-
Disassemble the power unit and clean and inspect the internal components
-
Measurement of electrolytic capacitor capacity value
-
Using fixtures to perform key indicator testing on power units
-
Upper control point simulation test
-
Load test on high-voltage electric belt
-
Improvement suggestions related to equipment
-
Equipment testing report
-
On site maintenance time
1 person per day
2 people for 2-6 days